• Home
  • _Company
  • _Image gall...
  • _Pipelines
  • Company
  • Products
  • Service
  • Distribution network
  • Contact
  • Exhibitions
  • Company history
  • Company group
  • Product development
  • Production
  • Quality assurance
  • Projects / Reference material
  • Image gallery
    • Infrastructures
    • Pipelines

Pipelines category images

Laying a pipeline through the Ammersee lake
Inspecting a pipeline after 27 years of operation
Pipeline laying in winter
Welding seam protected by BUTYLEN System AS 40 Plus during winter laying
Preparation of the pipeline surface by blast cleaning SA 2
Applying BUTYLEN tapes using DEKOMAT KGR application equipment
Longer rolls allow for more efficient application for longer sections
Applying BUTYLEN tapes using DEKOMAT KGR application equipment
Rehabilitation of a station using the LIQUITOL FK 2 2-component polyurethane system
Before rehabilitation
LIQUITOL FK 2 applied in hot spray process
Filling of nuts, screws and parts in the spray shadow using LIQUITOL FK 2-C

previous

Page 1 of 2

next

  • Sitemap
  • ·
  • Terms and conditions
  • ·
  • Imprint
  • ·
  • Print page
  • DEKOTEC GmbH © 2010