LIQUITOL® BLZ-System

System for protection of the critical ground-to-air transition area of steel pipes from corrosion.

·   Corrosion protection and mechanical protection layer for the
    ground-to-air transition of steel pipes
·   PUR spreadable coating
·   Easy application and safe mixing due to
    cartridge packaging of the spreadable coating

    LIQUITOL® FK2-C
·   2-component PU spreadable coating
·   Three-layer application:
        1. » FK2-C black
        2. » FK2-C gray
        3. » FK2-C black
·   Total thickness approx. 2.5 - 3.0 mm
·   Weather resistant
·   High mechanical stress resistance
·   Complies with DIN EN 10290 (Class B, Type 3) for
    operating temperatures of -20 to +80°C

Application stages LIQUITOL® BLZ System

Prepared surface of the ground-to-air transition
Prepared surface

This high-performance anti-corrosion coating surface requires blast cleaning (Sa 2.05 according to ISO 8501-1 and a mean surface roughness of 40-100 µm). The surface must be free of dust and dry.

 

Application of first layer, LIQUITOL FK2-C, black
LIQUITOL FK2-C, black

The temperature of the surface and the coating must be 3° above dew point.

LIQUITOL® FK2-C black is applied first

 

Application of the 2nd layer, LIQUITOL FK2-C, gray
LIQUITOL FK2-C, gray

Application of the second layer of the spreadable coating LIQUITOL® FK2-C in gray can be carried out after curing of the first layer. After this, the first layer will no longer shear. Depending on weather conditions, this can take 10-30 minutes.
Application of the 2nd layer must be carried out within at least 24 hours, otherwise the first layer must be roughened.

 

 

Cover coating LIQUITOL FK2-C, black
LIQUITOL FK2-C, black

Finally, the third layer is applied, LIQUITOL® FK2-C black.

The same conditions apply as for the application of the second layer.

LIQUITOL® FK2-C black is distinguished by a higher resistance to UV.

info box

Inquiry

Are you interested in this product? Please contact us directly online.